17June2026 Spinners moved 100mm apart Longer vanes installed Long vanes full forward rake posititon Short vanes in middle rake position Spinners 20mm rear of full forward position 14km/h 100kg/ha Chute is tilted so lower edge is 60mm further back Sides and rear are boxed in Long vane and short vane is throwing too far forward, smashing granules on front shroud Heavy shower of particles in centre of machine, bouncing out of the drop zone Showers each side of the roller bouncing off the side plates on the chute Test02 2.9 3.6 4.4 5.7 6.0 4.7 4.8 5.6 6.1 8.1 11.7 centre Test03 1.2 2.1 4.4 6.9 6.8 5.2 5.1 5.8 6.4 9.4 13.7 centre